Are you a subscriber but don’t have an online account?

Register for full online access.

 
 
 
 

More stories about Panels

  • Time-Saving Tools For Framers and Finish Carpenters

    Trying to speed production and increase accuracy on the job? These tools deserve a look.

  • Pouring a Structural Slab

    An East Coast builder describes the process of forming and pouring a structural garage slab using polystyrene deck forms.

  • Quicker Coffered Ceilings

    This production-oriented method greatly speeds this common ceiling treatment without sacrificing construction quality or aesthetics.

  • Letters

    Shearwall schedules, truss spacing, light-gauge steel correction

  • Framing a Round Tower

    A Long Island contractor uses preassembled framing and a forklift to build a dramatic circular stairwell.

  • Installing Residential Elevators

    A second-generation elevator installer lays out what GCs need to know to prepare for and coordinate the installation of residential elevators.

  • Gypsum-Board Firewalls

    A multifamily builder finds that gypsum-board area separation walls have some important advantages over traditional masonry walls.

  • Various Strengthening Garage Door Walls

    Q. Can anyone explain the actual technical concern and reason that new building codes are requiring specific structural improvements on garage door "lug walls" (the short walls next to the garage door opening)?

  • Two Formed & Foamed Dormers

    Shop-built dormers for a stress-skin roof

  • An Invisible Tile Access Panel

    Installing and tiling a whirlpool tub often means undoing someone else's work. A veteran tile contractor tells how he copes with sequence problems and provides future access to the pump.