Fasteners

Usually, the stud supplier will also supply the screws used to connect steel framing members. These are self-tapping 1/2-inch pan-head sheet-metal screws, the type with an integral drill tip that can penetrate 20-gauge steel. We use self-piercing coarse-thread drywall screws to connect 25-gauge steel studs to existing walls, screwing them right into the drywall. Once drywall is hung on the new framing, there’s no danger of lateral movement and so no need to connect to the existing framing. Of course, we also use drywall screws to attach the drywall to the studs. As a rule, you want to use a screw long enough to leave a minimum of three threads protruding through the steel.

Image

Various fasteners are needed to connect steel to itself and to building surfaces. Clockwise from left: Self-drilling screws are the standard for framing-to-framing connections. Self-piercing screws are effective in light, 25-gauge materials. Powder-actuated pins — typically 1/2-inch and 3/4-inch sizes — connect framing to hard concrete decks and structural steel beams. Tapcon concrete screws anchor steel door frames to concrete floors, and mushroom anchors serve in applications where pins may not hold as well.

Hard-surface nailers. We do a lot of fastening to steel beams, masonry walls, and concrete decks. On big jobs, our primary tool for this is a TrakFast TF1100 (800/241-5640, ramset.com), basically a high-powered cordless nail gun capable of shooting 1/2-inch to 1 1/2-inch pins into steel and concrete. The TrakFast is much faster than a powder-actuated tool (PAT) and holds 42 pins in the magazine, four times that of most PATs. It costs about $475, including a battery and charger; pins come in boxes of 1,000 along with a fuel cell for about $60. If we need to drive longer pins or need more power to penetrate hard concrete or thick steel beams, we use a Hilti PAT (866/445-8827, hilti.com).

Image

A TrakFast gas-powered nailer can outshoot a PAT in many applications, and it handles pins up to 1 1„2 inches long. The author’s crew relies heavily on this tool when fastening bottom tracks to the floor.

Mushroom-head anchors. In hard, brittle concrete, a mushroom anchor provides better holding power than a 1/2-inch pin. The anchors come in nylon and lead versions; lead definitely holds better in concrete. On smaller jobs, hammer-drilling the necessary holes is fast enough, so we skip the pins.

Stud crimper. This tool isn’t mandatory, but it can come in handy for fastening studs where a screw gun can’t go. Malco’s model PL1 (800/328-3530, malcoproducts.com) is the best one we’ve tried. It’s rated for 22-gauge steel and runs about $60.

Crimping can’t completely replace screwing, however, since the connection isn’t as secure. When the drywall is hung, the screws briefly deflect the stud flange and can force the crimp apart. And with heavier-gauge studs, the crimper simply isn’t capable of penetrating the steel.

It’s a good idea to check local building codes, too. Some inspectors require 100 percent screwed connections.

Running Track

The first step in framing walls is to snap the layout on the floor. Spraying it with clear lacquer preserves the chalk lines. To avoid walking or driving over the bottom plate while fastening the top plate, we install all of the top plates first. (The technique of framing a wall on the deck before standing it up is rarely used with steel. Unless you weld the studs to the track, you can’t attach both sides of the studs while they’re lying down. Even if you could, metal studs are not rigid like wood studs, so the assembly would still be twisty and likely to collapse on itself when lifted.)

Because the ceilings are typically complicated by ductwork, beams, and bar joists, we don’t lay out stud locations on the tracks before installing them.

To place the ceiling track, one worker moves a vertical laser along the floor lines while another fastens the track. If we’re fastening to corrugated-metal roof decking, we use self-tapping stud screws. If the deck is poured with concrete (as in multiple-story buildings), we shoot pins. If the walls are over 12 feet tall and we’re working from a scissor lift, we put all of the track, fasteners, and other supplies right in the basket.

Image

Self-tapping screws provide a fast, secure connection to steel roof decking. If the decking is capped with concrete, the author shoots pins instead.

At corners, it isn’t necessary to cut the track to exact length. Just run the first piece a little long, then snip the inside flange at the return point and hammer the excess flat. The return track can then overlap the first and complete the corner.

Image

Outside corners are simply snipped and overlapped. Corner studs are connected only to the track flanges — not to each other.

Slip track. Snow loads on large commercial roofs can cause the ceiling to deflect within its design tolerance. Nonbearing partitions must be designed to accommodate this movement. A slip track is a deep-leg track that allows the studs to be cut shorter than full height to accommodate periodic ceiling deflection. Since the studs can’t be screwed to the track, they are crimped. The crimp will fail before the wall buckles. (You can use screws to temporarily hold the stud in place until the drywall is installed and secures the studs.) You also have to leave about a 1-inch clearance gap between the drywall and the underside of the ceiling. The gap can be concealed by a piece of trim attached to the ceiling only.

Hollow Metal Door Frames

In our work we install more hollow metal Ceco (888/264-7474, cecodoor.com) door frames than any other type. These frames are installed before the bottom track and the studs. Once the frames are anchored in place, you run the bottom track and attach the steel studs directly to the door frame. Welded frames ship with temporary tack-welded steel angle spreaders that keep the jambs aligned during installation. After the drywall’s installed, you chop them out with a cold chisel.

Image

The author drills holes for mushroom anchors to secure a hollow metal door frame. Note the magnetic level at the head jamb.

Image

Plastic shims under the side jambs are used to level the head.

Image

Integral tabs in the frame’s side jambs provide connection points for the trimmer studs.

First, we stand the frame on layout and level the head, inserting plastic shims under either leg as needed. The side jambs have welded anchor tabs at the base for securing the frame to the floor with Tapcon concrete screws (877/489-2726, tapcon.com) or mushroom-head anchors. Coarse-thread wood screws work on plywood decks. A frame will stand on its own once it’s anchored to the floor, so we don’t add temporary bracing. Later, when the drywall’s installed, we plumb the frames. I’ll explain this later.

Installing Studs

Once the top track and the door frames are set, we cut and fasten the bottom track to the floor. I typically use mushroom anchors placed 4 inches in at either end and on 4-foot centers. If we’re shooting 3/4-inch pins, we space them at 2 feet on-center, since they don’t have the holding power of the anchors. We make sure the track is fastened down securely at door openings and corners. Then we add the layout marks for stud spacing (typically 16 inches on-center), window openings, and cabinet locations where blocking is required. For marking on steel, which can be oily, a black Sharpie works best.

Image

The bottom track is installed after all door frames are set. If shooting pins, the author uses a closer on-center schedule than when using mushroom anchors, which have better holding power in brittle concrete.

Steel studs are rotated into position in the installed track and plumbed, one at a time. Always keep the open side of the studs facing the origin of your layout; this ensures that at vertical joints, the drywaller screws the first panel to the more flexible open leg of the stud. This is important because drywall screws push the flange away before piercing it and pulling it back snug. If a panel has already been attached to the stiffer web edge of the stud, the screws driven into the floppier open end may not fully retrieve the flange, leaving a misaligned surface and finishing problems.

Image

Always face the open side of steel studs toward the origin of the layout. This ensures that at butt joints screws driven into the first panel will pull the flexible stud flange tight to the board, resulting in a flat wall finish (top). In the field, place screws closer to the stiffer web face of the stud (bottom).

When cutting door and window cripples, remember to cut all studs from the same orientation so the prepunched holes will match up. We save offcuts for bracing and patching; at the end of the job, all of the scrap goes to a sorting company for recycling.

The track flanges provide a little play, so it isn’t necessary to cut every stud to exact length. If the floor or the ceiling is slightly out of level, you can cut all the studs to the shortest dimension. If there’s a large discrepancy in level, a deep-leg top track can cover the difference.

With the top and bottom track installed, we stand all the full studs in the track, skipping over door and window locations and anywhere there’s an obstruction, like an overhead beam or hvac duct. These places require a header and cripple studs.

Headers. Nonstructural headers are sections of track cut to the desired length plus 4 inches for an attachment tab. We snip across the flanges 2 inches in from both ends, fold the web back at a 90-degree angle, and slip the flanges over the stud. Then we level the header and hold it in place with locking clamps while we screw the flanges to the stud.

Image

Nonstructural headers are made quickly by snipping channel flanges at the desired distance and folding the ends down (left). The channel tabs are then screwed to the trimmer studs (right).

Plumbing door frames. At door locations, we screw the trimmer studs directly to welded tabs on the hollow metal frame, centering the frame in the wall plane and making sure that the drywall can slip between it and the stud on both sides of the wall. On walls 12 feet or taller, we install double trimmer studs. This stiffens the wall at these locations and keeps it from rattling when the door is slammed. When we hang the drywall, it slips past the stud about 3/8 inch behind the hollow frame. We then plumb the frame and screw the drywall to the trimmer studs. The drywall holds the door frame plumb.

Image

Trimmer studs are connected directly to the hollow door frames with self-tapping screws. The drywall slips between the stud and the frame and holds the door frame plumb.

Wood Blocking

Interior finish work often requires plywood blocking to provide a nail base for trim or extra holding power for hanging cabinets and heavy-duty shelving. If the job calls for prehung wood doors, we frame rough openings and line them with framing lumber to catch the nails.

Image

Wood backers provide holding power for hanging cabinets and heavy-duty shelving.

Image

For prehung wood doors, rough openings are formed conventionally and lined with framing lumber to supply a nailing surface.


For applications like coat hooks or small shelving units that don’t need extra holding power, it’s okay to screw directly into the studs. When running narrow wood base trim, we use light nailing in combination with construction adhesive. You can shoot 16-gauge finish nails straight into single-thickness 20-gauge steel, but steel won’t hold nails like wood does. For wide baseboard profiles, we install plywood backers and rely on nails alone.

Brad Caspari is a project superintendent for Hunzinger Construction in Brookfield, Wis.