Curved walls. We considered special-ordering curved ICFs for the home's 30-foot radius walls, but for budget and schedule reasons ended up fashioning the curved blocks ourselves, from straight ones. We followed a table in the Logix manual that shows how to make various curves by shortening the inside face of standard blocks.

By flexing the blocks slightly, we were able to get them to follow the desired curve. Continuous bracing along the grade beam — kerfed 2x10s — held the bottom course in place; then each succeeding course mated with the nibs of the one below. Considering that they were made from straight blocks, the curves were surprisingly smooth. There were a few lumps and bumps, but nothing we couldn't fix with a belt sander.

Image

The crew creates the curve by cutting the inside faces of the block slightly shorter than the outside faces and flexing the pieces into an arc. Kerfed 2x10 braces hold the bottom course in line with the grade beam.

Fastening Ledgers

Floor joists in ICF buildings have traditionally hung from ledgers fastened with cast-in anchor bolts. On this job, we saved time by using Simpson's ICF ledger-connector hardware. In accordance with this method, we inserted the legs of an ICFVL wall plate through slots cut in the foam; the concrete anchors the plate. To install the 2-by ledgers, we placed them against the wall plates, lapped them with ICFVL-W hangers, and drove structural screws through into the plates. Hangers for LVL ledgers are also available, while light-gauge steel ledgers can be screwed directly to the plate.

Image

The upper floor hangs from ledgers attached with Simpson hardware designed for ICFs. The legs of the metal plate — punched so that they will key into the concrete — are inserted into slots in the foam.

Image

Then the plate is fastened with a screw so it can't fall out during the pour.

Image

After the concrete cures, the ledger is positioned against the wall and fastened to the plate with structural screws driven through a special hanger.

We spaced the wall plates 32 inches apart, taking care to locate them so that the ledger hangers wouldn't interfere with the joist hangers.

Door and Window Openings

If the door and window openings in this house had been rectangular, we could have used vinyl bucks. But because the heads were arched, we built wooden bucks on site.

Image

Carpenters plumb and brace the buck for an arch-top window.

Image

The buck for the garage opening is supported on a temporary stud wall; the pressure-treated side jambs will remain in place for fastening the overhead door tracks.

Often, door and window bucks can be left in place after the pour. But the doors and windows in this house were inset — and the exterior jambs finished with stucco — so the bucks would have to be removed. To make this easier, we fastened the bucks with metal framing angles and screws.

Image

To make it easy to remove, this window buck was assembled from the inside with framing angles and screws. Note the sloped sill; the inspection holes allow carpenters to verify that concrete has filled the blocks below.

For the arch-top openings in curved walls, we made the bucks straight but much thicker than the wall, to accommodate the radius.

Image

The arched bucks in curved walls were made extra wide to accommodate the radius.

Bracing and Pouring

Solid bracing is of course key to a successful pour, because wet concrete places a lot of pressure on the ICFs. We used the standard adjustable metal bracing designed to hold staging planks (Figure 8) and added wood bracing at those locations where the connections were the weakest — at cut blocks, for example, and at inside corners and the ends of walls. The smaller bucks were faced with solid sheets of OSB and were stiff enough to resist the force of wet concrete. The bucks in the larger openings required additional vertical and horizontal bracing.

Image

In preparation for concrete, the window bucks were reinforced with additional pieces of OSB and the wall thoroughly braced.

We stacked and poured the walls in stages. The first stage brought the walls to just above the main floor level. After a week of curing time, we framed and sheathed the floor, and then we formed and poured the rest of the way up.

Concrete. We used a 5-inch-slump five-sack mix containing 3/8-inch pea gravel and 20 percent fly ash. Normally, we wouldn't drop concrete more than 3 feet, but the forms contained so much rebar the concrete more or less rolled to the bottom. There wasn't room to use a tremie pipe. To avoid blowouts we worked our way around the perimeter — placing concrete in 3-foot lifts and vibrating as we went. We drilled witness holes through the bottoms of the window bucks so we could see whether the concrete had flowed underneath; if need be, we inserted a rod through the holes to move the concrete.

Image

The amount of rebar in the ICFs made it impossible to use a tremie pipe to place the concrete. Instead, one worker handled the hose at the top of the wall and another followed behind with the vibrator.

Plumbing and Electrical

ICF plumbing penetrations are simple: You can sleeve through the form before the pour or drill through after. Drains and vents of up to 2 inches in diameter will fit in a channel in the side of the foam form; we cut the sides of the channel with a recip saw and then rake out the foam with a pry bar.

Electrical wire is run in smaller channels, which we fill with spray foam once the wire's in place. Electrical boxes can be cut into the foam and screwed to the concrete. Logix ICFs are ribbed on the inside; we've found that if we cut through the foam and remove the concrete ribs with a cold chisel, a standard electrical box will come out flush with the drywall.

Exterior Finish

To keep the below-grade portions of the building dry, we waterproofed the foundation with Tremproof 250 GC (Tremco, 800/321-7906, www.tremcosealants.com), then covered it with MiraDrain 2000 (Carlisle, 888/229-0199, www.carlisle-ccw.com), a polyethylene air-gap membrane that drains water away from the wall.

Though ICF homes are often finished with lap siding, stucco is preferred in our area. With ICFs, we use the same synthetic stucco materials used with EIFS, which can be applied directly to the foam without paper and lath.

Our plastering sub applied a base coat of Parflex 304 (Parex, 800/537-2739, www.parex.com) with an embedded layer of fiberglass reinforcing mesh, followed by a second coat of the base-coat material. The top coat was Fino Alto (Variance Acrylic Finishes, 888/323-6404, www.variancefinishes.com), an integrally colored acrylic plaster.

Finally, to protect any areas of exposed foam between the top of the waterproofing and the stucco, we parged with Thoroseal (Thoro, 866/518-7171, www.thoroproducts.com).

Victor Rasilla is a working supervisor for Brinton Construction in San Leandro, Calif.