Eight-Hour Kitchen Remodel--Info Packets

The project involved four basic floor plans: Type A-sink left, Type A-sink right, Type B-sink left (shown), and Type B-sink right.

Each packet included a layout and plan view of the kitchen with verified field measurements.

To save time, all of the necessary cabinets, fixtures, materials, and accessories were identified on the Pull List, loaded onto carts, and delivered to the apartment undergoing renovation.

Electrical and plumbing checklists identified the specific work needed in the apartment and made it easy for the subs and crew to communicate with each other.

A sample plumbing checklist.

The final checklist tracked progress on each kitchen and helped keep the overall project on schedule.