To extend the life of the railing fasteners, the author fastens the top rail to the guard posts from below.
Slideshow: Prepping Guardrail for Cable
Between each guard post, he installs a 2x4 subrail to lock the posts firmly in position. This is required to resist the tension the cables transfer to the posts.
Slideshow: Prepping Guardrail for Cable
To streamline the install, he places bar clamps to hold the supplied drilling template to the posts with the bars facing away.
Slideshow: Prepping Guardrail for Cable
Fastening is easier with bars of the clamps facing away from where he needs to work with the template.