Outdoor Bonus Room
The deck was built along with the garage, not as a retrofit project, which allowed the railing posts to be incorporated into the roof framing. The deck framing consists of sleepers screwed to tapered joists. Note the blocking, which was installed to support the meeting boards that run perpendicular to the field in the center of the upper deck.