To finish the exterior of the new foundation, the crew applied waterproofing to the block, after first masking off the part of the block wall that would extend above grade. Read original article.
Tape Line
Removing the masking tape left a clean straight line on the block.
Enhanced Drainage
The crew next secured drainage mat to the block foundation with concrete fasteners.
Gravel Fill
The crew backfilled with pea gravel outside the mat to provide additional drainage.
All Buttoned Up
Once the topsoil was in place, the only remaining task was repairing the beam holes in the siding.