Slideshow: Preparing to Rework the Load Path

Slideshow: Preparing to Rework the Load Path

This photo shows the deck wrapping the A-frame-style wing of the house during the initial investigation by the author’s company.

Slideshow: Preparing to Rework the Load Path

Excavation in preparation for drilling helical piers was done by hand to carefully work around utilities.

Slideshow: Preparing to Rework the Load Path

Slideshow: Preparing to Rework the Load Path

Slideshow: Preparing to Rework the Load Path

A lumber extension attached to a rafter revealed that a waste line was in the exact location where a pier needed to be drilled.

Slideshow: Preparing to Rework the Load Path

After protecting the floor below the A-frame wing, subcontractors from the window company removed the lower windows.

Slideshow: Preparing to Rework the Load Path

Shoring was erected to support the floor during demolition.

Slideshow: Preparing to Rework the Load Path

To complete demolition of the old deck, additional shoring was erected to the left and right of the A-frame gable end. This shoring supported the roof extending over the deck on each side.