Slideshow: Prepping the Walls

Slideshow: Prepping the Walls

Toby draws layout lines for placing the straps every 4 feet on-center.

Slideshow: Prepping the Walls

After the layout is complete, a helper grinds these areas free of dirt and paint.

Slideshow: Prepping the Walls

Toby adds grout to the mortar joints to create a flat bonding surface.

Slideshow: Prepping the Walls

The wall surface ready for installing the carbon-fiber strapping.

Close X