Toby draws layout lines for placing the straps every 4 feet on-center.
After the layout is complete, a helper grinds these areas free of dirt and paint.
Toby adds grout to the mortar joints to create a flat bonding surface.
The wall surface ready for installing the carbon-fiber strapping.