Skip to main content
  • Newsletter
  • Login
  • Register
Journal of Light Construction
  • How To
    • Projects
    • Foundations
    • Framing
    • Exteriors
    • Roofing
    • Electrical
    • Plumbing
    • HVAC
    • Insulation
    • Interiors
  • Remodeling
  • Tools
    • Power Tools
    • Hand Tools
    • Trucks/Equipment
    • Fastening Tools
    • Safety/Workwear
  • Products
    • Kitchen
    • Bath
    • Foundations & Framing
    • Energy & HVAC
    • Exteriors & Roofing
    • Windows & Doors
    • Plumbing & Electrical
    • Interior
    • Office Technology
  • Business
    • Employees
    • Estimating & Job Costing
    • Legal
    • Sales & Marketing
    • Money
    • Scheduling
  • Decks
  • Cost vs. Value
Login Register
  • How To
    How To
    • Projects
    • Foundations
    • Framing
    • Exteriors
    • Roofing
    • Electrical
    • Plumbing
    • HVAC
    • Insulation
    • Interiors
  • Remodeling
  • Tools
    Tools
    • Power Tools
    • Hand Tools
    • Trucks/Equipment
    • Fastening Tools
    • Safety/Workwear
  • Products
    Products
    • Kitchen
    • Bath
    • Foundations & Framing
    • Energy & HVAC
    • Exteriors & Roofing
    • Windows & Doors
    • Plumbing & Electrical
    • Interior
    • Office Technology
  • Business
    Business
    • Employees
    • Estimating & Job Costing
    • Legal
    • Sales & Marketing
    • Money
    • Scheduling
  • Decks
  • Cost vs. Value
SubscribeNewsletterMagazine Archives

Projects

Design-Build Disaster Resistant Building Energy Efficient Production Building Remodeling/Historic Preservation
  • JLC Case Study

    Building in the Unknown: Pushing Forward with Attainable Zero

    Today’s financial landscape takes more patience, planning, and flexibility than ever before.

    4 MIN READ
  • Building Performance

    High Performance on a Limited Budget

    10 MIN READ
  • JLC Case Study

    Preconstruction Begins for the 2025 JLC Case Study Home

    5 MIN READ
    Above-code enclosure. While it's not required by code in climate zone 3, Addison Homes typically uses 2x6 framing (with R-20 cavity insulation) in combination with R-5 exterior insulation. The author has found this to be a proven solution for comfort, quiet, durability, and energy efficiency. Exterior insulation adds some upfront cost, but the payoff is felt immediately: more even temperatures, reduced noise, and energy savings that typically pay for the investment within a few years.
  • JLC Case Study

    Attainable Zero: Building to ZERH Standards

    5 MIN READ
  • BUILDER

    House Plan of the Week: Tiny Lot, Big Outdoor Living

    1 MIN READ
    3 story farmhouse plan for a small lot, front exterior. See more views at Houseplans.
  • BUILDER

    House Plan of the Week: Modern Cottage

    1 MIN READ
    Modern cottage house plan, front exterior. See more views at Houseplans.
  • BUILDER

    House Plan of the Week: Chic Modern Duplex

    1 MIN READ
    Modern duplex plan, front exterior. See more views at Houseplans.
  • JLC Case Study

    Introducing Attainable Zero: A JLC Case-Study Home

    6 MIN READ
  • Projects

    Addison Homes Recognized for Innovation

    2 MIN READ
  • BUILDER

    House Plan of the Week: Family-Friendly Starter Home

    1 MIN READ
    Narrow-lot starter home design, front exterior. See details at Houseplans.

Trending

  • Q&A

    Which End Up For Receptacles?

    2 MIN READ
  • Stairbuilding

    Tuning Up Construction Stairs

    10 MIN READ
  • Tools of the Trade

    Workstation Worklight

    2 MIN READ
Editorial Cover

Digital Edition 2025

Only JLC subscribers have access to content from the May/June issue of JLC at this time. Articles will be posted online soon. In the meantime, feel free to browse the digital edition.

Subscribe Magazine Archives

Explore Our Sites

  • Builder Logo
  • MFE Logo
  • AHF Logo
  • Architect Logo
  • PSN Logo
  • Aquatics International Logo

Journal of Light Construction is part of Zonda Media, a Delaware corporation | © 2025 All rights reserved

About Advertise Contact Us Privacy Policy Accessibility Statement

Powered By Zonda Logo