Builder’s Guide to Common Code Violations

Catch these routine mistakes before they catch up with you

1 MIN READ
I don’t believe there is anything in the building process that is under as much time pressure as the final inspection. Nearly everyone is always in a rush. Typically the moving van is on the way, and if the inspector finds a code violation, frantic phone calls to the client are just plain too late. Much of the time, trouble can be traced to a sub or an inexperienced employee. But whatever the cause, it is the responsibility of the general contractor to fix the problem, and soon. So you end up canceling a fishing trip — anything to get the certificate of occupancy. Here are ten of the biggest headaches likely to turn up during the final

Register to download and view this article

Get your copy

About the Author