January 2019 Table of Contents

Features
Schedule Management for Project Managers JLC BUILDER GUIDE Schedule Management for Project Managers

Schedule the work, and work the schedule: Strategies for keeping your jobs on track and on budget. Read more

Better Exterior Wall Headers Better Exterior Wall Headers

Mike Guertin's approach to framing headers offers reduced lumber costs, fewer call-backs, and improved energy efficiency. Read more

Training the Trades
Air-Barrier Basics Air-Barrier Basics

The lack of a good, airtight control layer will let in unconditioned outside air or let out conditioned inside air, reducing a home’s performance and wasting energy dollars. Read more

Q&A
Raising Ceiling Joists Raising Ceiling Joists

An engineer explains how to create a vaulted ceiling in a low-pitched roof with no structural ridge. Read more

Business
Nailing Down Overlooked Overhead Nailing Down Overlooked Overhead

“General Requirements” are a big cost on virtually every project, yet they are often under­estimated or outright overlooked. Read more

Troubleshooting
A 'Never Worry Again' Insulated Ceiling A 'Never Worry Again' Insulated Ceiling

To properly fix stained drywall near recessed lights in a cathedral ceiling, first you have to diagnose the problem. Read more

Tools of the Trade
Air-Barrier Basics Air-Barrier Basics

The lack of a good, airtight control layer will let in unconditioned outside air or let out conditioned inside air, reducing a home’s performance and wasting energy dollars. Read more

Trade Tips
Framing for the Long Haul Framing for the Long Haul

Save your back by making this 2-wheeled cart and using it to move heavy materials around the jobsite. Read more

Close X