To complete the job of reinforcing the floor system, the joists hacked up by plumbers had to be headed off.
Ernest secures metal clips to the new header using structural screws made by Simpson Strong Tie.
The completed framing transfers the floor load around an existing drain pipe.
Framing as a system: The completed framing repairs result in a flat, level floor/ceiling assembly with all loads transferred effectively to the foundation.